PWSA PROVIDES THE BEST QUALITY WATER AT THE LOWEST POSSIBLE COST.
PAY YOUR BILL
REPORT A PROBLEM
Upgrading to An Advanced Metering Infrastructure (AMI)

The Pittsburgh Water and Sewer Authority is upgrading to an Advanced Metering Infrastructure (AMI).
 

Read our FAQ for more information.

 

Pay by Cash - 7 Eleven Locations

PWSA is now offering a new way to pay your bill.  Simply bring your bill stub to a 7-Eleven® location and tell the cashier the amount you wish to pay.  Convenience fee applies.

For more info click here.

The PWSA Water Quality Report is Available Online

2013 Water Quality Report

PWSA works hard to provide safe reliable drinking water at the lowest possible cost.
No water quality violations in over 30 years!

If you prefer to have a hard copy sent by mail, please call Customer Service at 412-255-2423 to request a copy.

Follow PWSA on Twitter

PWSA is posting work locations, outages and water saving tips on Twitter. 

Check out the live twitter feed at the lower right side of the homepage!

Reading PWSA's New Bill Design

PWSA has adopted a new bill design that’s easier to read and allows customers to easily track their consumption costs.  Customers can familiarize themselves with the new bill format by clicking here

 

Traffic will be maintained at one lane inbound

6/17/14 @ 3:16 pm

The Pittsburgh Water and Sewer Authority (PWSA) is replacing a 6-inch water valve on Court Street in Hazelwood. Work will begin at 8:00 am and is expected to be completed by 4:00 pm.

6/10/14 @ 3:55 pm

Residents in Lawrenceville will experience an interruption of water service

6/09/14 @ 5:44 pm
Murray Avenue (Squirrel Hill)

PWSA is installing two new water valves in Squirrel Hill; a 20-inch valve at the intersection of Murray Avenue and Forward Avenue; and a 6-inch valve at 2236 Murray Avenue.  The additional valves will increase isolation and minimize the impact on customers during maintenance.  Work will begin Monday, July 7, 2014 at midnight and is expected to be completed six hours later at 6:00 am. 

7/03/14 @ 1:27 pm
Kenwood Avenue (Perry South)

PWSA is repairing a 15-inch sewer on Kenwood Avenue in Perry South.

7/03/14 @ 1:23 pm
Valmont Street, Aylesboro Avenue and Northumberland Street (Squirrel Hill)

PWSA is implementing a sewer improvement project on Valmont Street, Aylesboro Avenue and Northumberland Street in Squirrel Hill.  The project consists installing new 8", 15" and 24" storm sewers and a new 8" water main. 

7/03/14 @ 1:22 pm
Sterret Street (Homewood)

PWSA is repairing a 12-inch sewer on Sterret Street at Fielding Way in Homewood.

7/03/14 @ 1:14 pm
Buena Vista, Clayton, Langtry and Kincaid (North Side)

PWSA is relaying an 8-inch water main in Buena Vistra Street, Clayton Street, Langtry Street and Kincaid Street in the North Side.  Final restoration is expected to be completed byt he end of July. 

6/06/14 @ 5:21 pm
2nd Avenue at the Hot Metal Bridge (Oakland/Hazelwood)

PWSA is replacing a 26-inch water valve on 2nd Avenue at the Hotal Metal Bridge in the Oakland/Hazelwood Area. 

4/23/14 @ 4:03 pm
Hamilton Avenue at North Braddock Avenue (Homewood)

PWSA is repairing a sewer and a catch basin on Hamilton Avenue at North Braddock Avenue in Homewood. 

4/23/14 @ 3:55 pm
North Avenue at Bidwell Street (Manchester)

PWSA is replacing a fire hydrant on North Avenue at Bidwell Street in Manchester.

4/23/14 @ 3:50 pm
2nd Avenue at Greenfield Avenue (Greenfield/Hazelwood)

PWSA is replacing a fire hydrant on 2nd Avenue at Greenfield Avenue in Greenfield/Hazelwood area. 

4/23/14 @ 3:49 pm
Pittsburgh Zoo Parking Lot

PWSA is repairing a 24-inch sewer in the parking lot of the Pittsburgh Zoo. 

4/23/14 @ 3:34 pm
Arlington Avenue (Arlington)

PWSA is replacing water service lines on Arlington Avenue in Arlington. 

4/23/14 @ 3:30 pm
Heth's Run Bridge (Morningside)

PWSA is relocating a 72-inch storm sewer, 60-inch sanitary sewer and a 36-inch water main in coordination with PennDOT's replacement of Heth's Run Bridge in Morningside. 

4/23/14 @ 3:29 pm
Liberty Avenue at 39th Street (Lawrenceville)

PWSA is repairing a 6-inch water main on Liberty Avenue at 39th Street in Lower Lawrenceville. 

2/19/14 @ 10:16 am
Connecticut Avenue (Beechview)

PWSA is repairing a manhole on Connecticut Avenue in Beechview. 

2/19/14 @ 10:02 am
Bakery Square 2.0 / Penn Avenue (East End)

A private contractor is installing new water and sewer infrastructure in conjunction with Bakery Square 2.0.

2/19/14 @ 10:00 am
Penn Avenue at Gross Street (Lawrenceville)

PWSA is installing a 15-inch storm sewer and catch basins on Penn Avenue at Gross Street.

1/27/14 @ 12:00 am
Virginia Avenue at Shiloh Street (Mt. Washington)

PWSA is replacing a 20-inch water vale at the intersection of Virginia Avenue and Shiloh Street.

1/27/14 @ 12:00 am
First Avenue (Downtown)

PWSA is replacing a 12-inch water valve on First Avenue between Stanwix Street and Market Street Downtown.

1/27/14 @ 12:00 am
Baum Boulevard at South Atlantic Avenue (Bloomfield)

PWSA is installing a new 12-inch water main on Baum Boulevard between South Atlantic Avenue and South Negley Avenue.

1/27/14 @ 12:00 am
South Neville Street at Henry Street (Oakland)

PWSA is repairing a 24-inch water valve on South Neville Street at Henry Street in Oakland. 

12/04/13 @ 11:23 am
Aspen Street (Bloomfield)

PWSA is relaying a 15-inch sewer on Aspen Street at Cypress Street in Bloomfield. 

12/03/13 @ 3:50 pm
Rose Street / Addison Terrace (Hill District)

PWSA is relaying a 12-inch water main and a 15-inch sewer on Rose Street in the Hill District.

12/03/13 @ 3:49 pm
Waterfront Place at 21st Street (Lawrenceville)

PWSA is working in conjunction with the Waterfront Place Development to relocate and install new water and separate sewers on Waterfront Place from 14th Street to 21st Street.  

11/18/13 @ 9:22 am
Woodworth Street and Cypress Street (Bloomfield)

PWSA is relocating and reconstructing sewers on Woodworth Street and Cypress Street for the new UPMC Luna Parking Garage. 

11/18/13 @ 9:21 am
West Carson Street (West End)

PWSA is working in conjunction with PennDOT to relocate a 20-inch water main and install new separate sewers on West Carson Street between the West End Circle and McKees Rocks.  This project is being done in conjunction with the PennDOT project to widen West Carson Street.

11/18/13 @ 9:20 am
State Route 28

PWSA is working with PennDOT to replace and relocate water and sewer infrastructure along State Route 28.  This work is being done in conjunction with the widening of Route 28.

11/18/13 @ 9:13 am
Penn Avenue (Bloomfield)

PWSA is working in conjunction with PennDOT and the City of Pittsburgh to relocate and install new separate sewers and catch basins along Penn Avenue between Evaline Street and Mathilda Street.  This work is being done in conjunction with Phase I of Penn Avenue Reconstruction.

11/18/13 @ 9:10 am
Brookline Boulevard (Brookline)

PWSA is relocating and installing new storm sewers and catch basins on Brookline Boulevard between Pioneer Avenue and Whited Street.

11/18/13 @ 9:07 am