PWSA PROVIDES THE BEST QUALITY WATER AT THE LOWEST POSSIBLE COST.
PAY YOUR BILL
REPORT A PROBLEM
Earth Day

PWSA encourages our customers to celebrate Earth Day by drinking tap water.
Tap water is  less expensive, safer and more sustainable than bottled water.
It also helps to keep our neighborhoods cleaner, keeps bottles out of landfills, and reduces our carbon footprint.

Upgrading to An Advanced Metering Infrastructure (AMI)

The Pittsburgh Water and Sewer Authority is upgrading to an Advanced Metering Infrastructure (AMI).
 

Read our FAQ for more information.

 

PWSA Lifts the Boil Water Advisory

PWSA is pleased to inform you that the Boil Water Advisory for Water Works Shopping Mall and Aspinwall Borough was lifted this morning.

For more information please read the following PDF.

 

Reading PWSA's New Bill Design

PWSA has adopted a new bill design that’s easier to read and allows customers to easily track their consumption costs.  Customers can familiarize themselves with the new bill format by clicking here

Follow PWSA on Twitter

PWSA is posting work locations, outages and water saving tips on Twitter. 

Check out the live twitter feed at the lower right side of the homepage!

2nd Avenue at the Hot Metal Bridge (Oakland/Hazelwood)

PWSA is replacing a 26-inch water valve on 2nd Avenue at the Hotal Metal Bridge in the Oakland/Hazelwood Area. 

4/23/14 @ 4:03 pm
Hamilton Avenue at North Braddock Avenue (Homewood)

PWSA is repairing a sewer and a catch basin on Hamilton Avenue at North Braddock Avenue in Homewood. 

4/23/14 @ 3:55 pm
North Avenue at Bidwell Street (Manchester)

PWSA is replacing a fire hydrant on North Avenue at Bidwell Street in Manchester.

4/23/14 @ 3:50 pm
2nd Avenue at Greenfield Avenue (Greenfield/Hazelwood)

PWSA is replacing a fire hydrant on 2nd Avenue at Greenfield Avenue in Greenfield/Hazelwood area. 

4/23/14 @ 3:49 pm
6949 Churchland Street (Lincoln-Lemington)

PWSA is repairing a 6-inch water main on Churchland Street in Lincoln-Lemington.

4/23/14 @ 3:42 pm
Colebrook Avenue at Longmore Avenue (Beechview)

PWSA is replacing a collapsed 15-inch sewer on Colebrook Avenue at Longmore Avenue in Beechview.

4/23/14 @ 3:36 pm
Pittsburgh Zoo Parking Lot

PWSA is repairing a 24-inch sewer in the parking lot of the Pittsburgh Zoo. 

4/23/14 @ 3:34 pm
Arlington Avenue (Arlington)

PWSA is replacing water service lines on Arlington Avenue in Arlington. 

4/23/14 @ 3:30 pm
Heth's Run Bridge (Morningside)

PWSA is relocating a 72-inch storm sewer, 60-inch sanitary sewer and a 36-inch water main in coordination with PennDOT's replacement of Heth's Run Bridge in Morningside. 

4/23/14 @ 3:29 pm
South Busway at Warrington Avenue

PWSA is rehabilitating a 72-inch sewer along the South Busway from Rt. 51 to Warrington Avenue.

4/23/14 @ 3:25 pm
Clay Street at Powers Alley (Sharpsburg)

PWSA is replacing a 6-inch water valve on Clay Street at Powers Alley in Sharpsburg.

4/23/14 @ 3:21 pm
Liberty Avenue at 39th Street (Lawrenceville)

PWSA is repairing a 6-inch water main on Liberty Avenue at 39th Street in Lower Lawrenceville. 

2/19/14 @ 10:16 am
Arbor Street at Pointview Street (Lincoln-Lemington)

PWSA is repairing a sewer, manhole and catch basin on Arbor Street at Pointview Street in Lincoln-Lemington.

2/19/14 @ 10:13 am
Connecticut Avenue (Beechview)

PWSA is repairing a manhole on Connecticut Avenue in Beechview. 

2/19/14 @ 10:02 am
Bakery Square 2.0 / Penn Avenue (East End)

A private contractor is installing new water and sewer infrastructure in conjunction with Bakery Square 2.0.

2/19/14 @ 10:00 am
West Park / Branchport Street (Central North Side)

PWSA is rehabilitating sewers in West Park in the Central North Side.  

2/19/14 @ 12:00 am
Penn Avenue at Gross Street (Lawrenceville)

PWSA is installing a 15-inch storm sewer and catch basins on Penn Avenue at Gross Street.

1/27/14 @ 12:00 am
Baum Boulevard at South Atlantic Avenue (Bloomfield)

PWSA is installing a new 12-inch water main on Baum Boulevard between South Atlantic Avenue and South Negley Avenue.

1/27/14 @ 12:00 am
Virginia Avenue at Shiloh Street (Mt. Washington)

PWSA is replacing a 20-inch water vale at the intersection of Virginia Avenue and Shiloh Street.

1/27/14 @ 12:00 am
Penn Avenue at North Lexington Avenue (Homewood)

PWSA is replacing a 16-inch water valve at Penn Avenue and North Lexington Avenue.

1/27/14 @ 12:00 am
Oranmore Street (Stanton Heights)

PWSA is repairing the sewer, catch basin and manhole on Oranmore Street.

1/27/14 @ 12:00 am
First Avenue (Downtown)

PWSA is replacing a 12-inch water valve on First Avenue between Stanwix Street and Market Street Downtown.

1/27/14 @ 12:00 am
South Neville Street at Henry Street (Oakland)

PWSA is repairing a 24-inch water valve on South Neville Street at Henry Street in Oakland. 

12/04/13 @ 11:23 am
Aspen Street (Bloomfield)

PWSA is relaying a 15-inch sewer on Aspen Street at Cypress Street in Bloomfield. 

12/03/13 @ 3:50 pm
Rose Street / Addison Terrace (Hill District)

PWSA is relaying a 12-inch water main and a 15-inch sewer on Rose Street in the Hill District.

12/03/13 @ 3:49 pm
Winterton Street (Highland Park)

PWSA is repairing a 12-inch sewer on Winterton Street in Highland Park.

12/03/13 @ 3:46 pm
Waterfront Place at 21st Street (Lawrenceville)

PWSA is working in conjunction with the Waterfront Place Development to relocate and install new water and separate sewers on Waterfront Place from 14th Street to 21st Street.  

11/18/13 @ 9:22 am
Woodworth Street and Cypress Street (Bloomfield)

PWSA is relocating and reconstructing sewers on Woodworth Street and Cypress Street for the new UPMC Luna Parking Garage. 

11/18/13 @ 9:21 am
West Carson Street (West End)

PWSA is working in conjunction with PennDOT to relocate a 20-inch water main and install new separate sewers on West Carson Street between the West End Circle and McKees Rocks.  This project is being done in conjunction with the PennDOT project to widen West Carson Street.

11/18/13 @ 9:20 am
State Route 28

PWSA is working with PennDOT to replace and relocate water and sewer infrastructure along State Route 28.  This work is being done in conjunction with the widening of Route 28.

11/18/13 @ 9:13 am
Penn Avenue (Bloomfield)

PWSA is working in conjunction with PennDOT and the City of Pittsburgh to relocate and install new separate sewers and catch basins along Penn Avenue between Evaline Street and Mathilda Street.  This work is being done in conjunction with Phase I of Penn Avenue Reconstruction.

11/18/13 @ 9:10 am
Brookline Boulevard (Brookline)

PWSA is relocating and installing new storm sewers and catch basins on Brookline Boulevard between Pioneer Avenue and Whited Street.

11/18/13 @ 9:07 am
Bartold Street (Marshall-Shadeland)

PWSA is replacing the existing 12-inch sewer on Bartold Street between Superior Avenue and Hodgkiss Street.

11/18/13 @ 9:00 am